Resources for Specifiers

Architect Center

Everything you need to detail, specify, and defend a resinous flooring system — CAD details, CSI 3-part specifications, system selection guidance, and a technical team that answers in 48 hours. One source. Zero guesswork.

A Specifier-Grade Partner, Not Just a Product Catalog

Maverick is both manufacturer and installing contractor. That means the details you pull from this library reflect how systems actually get built — cove radius details that trowel cleanly, terminations that survive wheel traffic, joint treatments that hold up to wash-down. When you specify Maverick, single-source responsibility is written into the section.

  • Standard details in PDF and DWG — cove base, drains, terminations, wall and curb conditions for every system family.
  • Editable CSI 3-part specifications — Division 09 fluid-applied flooring sections plus Division 03 and 07 companions.
  • Project-specific review — substrate, chemistry, thermal, and downtime requirements vetted before the spec closes.
  • USDA / FDA / HACCP-compliant systems — documentation to back up regulated-environment submittals.
  • 48-hour response — questions during design or bidding get an answer from a technical rep, not a voicemail tree.

Standard Colors

Standard offerings shown below. On-screen colors are representative only — request physical drawdown samples for final selection and owner sign-off.

Standard Colors — All Maverick Floor Systems

Seven standard colors available across MavCoat, MavSeal, and MavCrete systems, selected to blend with cured concrete and common facility palettes. Download the Maverick color chart (PDF) for the full reference.

  • Haze Gray
  • Light Gray
  • Deck Gray
  • Sandstone
  • White
  • Black
  • Tile Red

Beyond the standard range, the MavTints universal tinting system is compatible with all MavCoat, MavSeal, and MavCrete products for precise color matching to custom and safety-marking requirements — contact a technical rep for matching and lead times.

Have a Section in Front of You?

Send us the project conditions and we will return a system recommendation, draft specification, and applicable details — within 48 hours.